Construction of Dam and Appurtenant works of Yagachi, Belur – Tq, Hassan – Dist.
Location: Belur, Hassan Dist. KARNATAKA
Construction of Earthen Dam with Gated Spilway, Guide wall, Tail channel, Head Regulator across river Waki near Kurnoli (V), Igatpuri (Tq), Nashik (Dist.)
Location: Kurnoli (V), Nashik Dist., MAHARATRA
Formation of earth dam including excavation and back filling, cut of trench, laying of filter, Rock toe, toe wall for the reach from Km 9.00 to 9.50, Km 9.50 to 10.00 and Km 10.00 to 10.50
Location: Kandaleru Dam, Nellore Dist., ANDHRA PRADESH
Construction of Masonry Dam across river Tarali at Dangastewadi (V), Patan (Tq), Satara (Dist.)
Location: Dangastewadi (V), Satara Dist., MAHARASHTRA
Construction of Ogee Spillway including Bank connections and left side Earthdam of Suddavagu Project, Bhainsa (V&M), Adilabad District.
Location: Bhainsa (V&M), Adilabad Dist., ANDHRA PRADESH
NABARD – RIDF-III Minor Irrigation Construction of Check Dam across Paleru River Near Tangutur (V & M), Prakasam District.
Location: Tangutur (V), Prakasam Dist., ANDHRA PRADESH
Formation of embankment of V.B.R. from Km 4.30 to 5.30 from level +249.00 to 268.00 and from Km 5.30 to 5.40 from level +248.00 to 268.00 (TBL)
Location: Velgode, Kurnool Dist., ANDHRA PRADESH
Formation of Balancing Reservoir at Ramatheertham on Ongole Branch canal
Location: Prakasam Dist., ANDHRA PRADESH
Construction of Barrage across Bhima river near Channegaon Barur (Balance Work) Indi- Tq, Bijapur District.
Location: Bijapur Dist., KARNATAKA
Construction of Narmada Main Canal including Earthwork, Lining, Structures and Service Roads from reach Km 81.804 to Km 90.045
Location: Vitoj, Godra Dist., GUJARAT
Constructing Narmada Main Canal including Earthwork, Lining, Structures and Service Roads from reach Km 177.148 to Km 188.785 (Package No. 4)
Location: Kapadwanj, GUJARAT
Constructing Narmada Main Canal including Earthwork, Lining, Structures and Service Roads from reach Km 328.846 to Km 342.482 (Package No. 7)
Location: Patan, GUJARATH
C.C. Lining in Km 81 to 127 of Main Canal and Km 4 to 16 of Branch Canal No.1 of Nandur Madmeshwar Canal
Location: Vaijapur, MAHARASHTRA
Construction of Waste weir, guide wall, body wall, stilling basin & wing-cum-sluice of Sangameswar Medium Project
Location: Osmanabad, MAHARASHTRA
Improvements to Left Canal from Km 0.000 to Km 21.530 of Sadarmatt Anicut.
Location: Nizamabad Dist., ANDHRA PRADESH
Kakatiya Canal Distributory No. 83 from Km 20.932 to 35.372 lining for Minors and Sub-Minors from 35 Cusecs to 1 cusec and Construction of New Structrues.
Location: Karimnagar Dist., ANDHRA PRADESH
Excavation and formation of Inlet channel from Km 119.650 of K.C. Canal to Alagnur Balancing Reservoir including Cross Masonry and Cross Drainage Works.
Location: Kurnool Dist., ANDHRA PRADESH
Earthwork, Excavation and forming Embankment from reach Km 77.90 to Km 79.00 of Telugu Ganga Project Main Canal.
Location: Allagadda, Kurnool Dist., ANDHRA PRADESH
Construction of Narayanapur Right Bank Canal from reach Km 63.000 to Km 64.000
Location: Deodurg, KARNATAKA
Providing Cement Concrete Pavements to (R&B) Roads in Kandukur Town Limits
Location: Kandukur, Prakasam Dist., ANDHRA PRADESH
Copyright © 2010 - Harvins - All rights reserved.